New - Universal Thread Women's Curved Leg Jeans Denim Jumpsuit Overalls, Medium Wash

$13.99
$40.00
Condition:

Color
Size
Condition

Quantity:

Description

•Universal Thread denim jumpsuit in medium wash
•Midweight cotton-lyocell fabric construction
•Sleeveless design
•V-neckline with half-length zippered front
•Full-length, curved-leg silhouette
•Multiple pockets
•Fair Trade certified

See the Size Chart

Embrace casual chic with this Curved-Leg Denim Jumpsuit from Universal Thread. The blue denim medium-wash jumpsuit is made of a midweight cotton-lyocell blend for comfortable all-day wear. The sleeveless design is given a sophisticated twist with the front snap placket over a half-length zipper fastening, while the flattering V-neckline and curved-leg silhouette offer a breezy look. Multiple front and back pockets complete the design with functional flair.


Sizing: Womens
Material: 40% Cotton, 20% Recycled Cotton, 40% Lyocell
Inseam Length: 31 Inches
Closure Style: Fly Snap and Zipper
Garment Style: Sleeveless, Front Half Length Zipper, Front Snap
Hem Style: Plain Hem
Fit: Relaxed Leg
Garment Length: Full
Neckline: V Neck
Fabric Name: Woven, Denim
Cuff Type: No Cuff
Garment Details: Front Placket, Patch Pocket, Front Pocket, Back Darts, Front Darts, Back Pocket, Medium Wash
Industry or Government Certifications: Fair Trade Certified
Garment back type: Plain
Fabric Weight Type: Midweight Fabric
UPF rating: No UPF Rating
Garment sleeve style: Sleeveless
Care and Cleaning: Machine Wash, Tumble Dry
UPC:
Model:

Product Conditions

New: Item is in original box and shows no signs of use. Apparel packaging may vary. The packaging may have minor signs of wear or stickers.

Open-Box: Item has been opened, may or may not be in original packaging, and may show signs of light use. Item may show signs of cosmetic damage and may be missing pieces or accessories which were discovered during visual inspections.

Refurbished: These items have been refurbished by the manufacturer or an approved refurbisher. The product functions like new and shows minimal, if any, signs of wear. Units may be shipped in non-retail packaging. Backed by a 90-day warranty. For more details, click here.

Shipping and Returns

Enjoy FREE shipping on all orders, dispatched within 1-2 days of your purchase.

Expect your order to arrive within 2 to 3 business days after shipping.

You have a 30-day window to return your item. Ensure it remains unused and in its original condition. Review all policies in our FAQs.

Payment & Security

PAYMENT METHODS

Your payment information is processed securely. We do not store credit card details nor have access to your credit card information.

Title

SECURITY

New - Universal Thread Women's Curved Leg Jeans Denim Jumpsuit Overalls, Medium Wash

$13.99
$40.00
Condition:

Color
Size
Condition

Quantity:

THE ART OF SOUND